Below are some photos of Kel Evens crew doing stage one of the plumbing works. Which is connecting shed 1 and shed 2 to the plumbing water and sewerage lines on the site. The RRC have approved the total plans on the site so we can proceed when we get the funding. The second stage will be to connect the water sewer and power to the site. This will be conditional on us raising the funding to do the second stage, ( Approx $ 45000) so if anyone has a rich relative please have a talk with them!!!